RoRo or container: how a used truck or excavator actually leaves China for your port

The shipping method decides the preparation, not the other way round. How we choose between ro-ro, container, flat rack and breakbulk for used trucks and machinery, and what a buyer must confirm before a vessel is booked.

When a buyer asks what shipping will cost, the honest answer starts with another question: how will the unit physically get onto a vessel? A tractor unit that drives under its own power has very different options from an excavator on tracks, and the choice between ro-ro, container, flat rack and breakbulk shapes the preparation, the lashing method and the documents long before any vessel is booked.

The method is decided by the cargo, not by the price list

The first filter is simple: can the unit move itself? Wheeled tractors, trucks and self-propelled machines are candidates for ro-ro carriers, where they are driven on board and parked on a deck. Crawler machines, loaders with attachments fitted, and anything too tall or wide for a deck opening usually end up on a flat rack or shipped breakbulk. Smaller units, spare parts and dismantled machines travel in containers. Before we quote anything we confirm four facts: whether it drives, whether the brakes work, its operating weight, and its exact dimensions with attachments fitted. An excavator photographed without its boom extension is not the same cargo as the machine that arrives at the port gate.

RoRo: drive on, lash down, sail

On a ro-ro carrier the unit is driven up the ramp, parked on its assigned deck and lashed by the wheels. The method is fast and gentle, but it has a hard precondition: the unit must roll and steer under its own power at the port — battery charged, tyres holding air, fuel level following the carrier's rules, and the keys travelling with the unit. If an engine will not start at the port gate, the plan changes on the spot and the extra cost follows. We test-start every unit before handover and photograph the instrument panel with the engine running, so the condition at the yard is documented.

Container loading: dismantle, crib, lash

A 40-foot high-cube container can take a rigid truck or an excavator prepared for the box. Preparation is real work: the cab or boom arm may be dismantled, the machine is set on timber cribbing, lashing points are welded or strapped to the container floor, and every stage is photographed for the surveyor. Containers suit lanes with no ro-ro service, and the machine travels enclosed and out of the weather. The trade-off falls on the buyer's side: someone at destination must unload and reassemble the machine. We confirm that capability before we load.

Flat rack and breakbulk: when neither box nor ramp fits

Machines that are over height, over width, or too heavy for a container floor travel on a flat rack or directly on the vessel's deck as breakbulk. Here the lashing plan and the marked lifting points become critical: a crane does the work a ramp does on ro-ro, the stevedore lifts where we mark, and the lashing crew secures the cargo for the passage. Over-height and over-width cargo also narrows the choice of ports, which is why we confirm the discharge port can handle the unit before anything is booked, not after.

What we need from you before booking

To hold space on a vessel we need a short list confirmed by the buyer: the discharge port and any inland leg, your preferred shipping window, whether the unit drives, exact dimensions and weight with attachments, and who clears customs at destination. On our side we confirm stock availability, the loading port schedule and the documentation closing date. Once those pieces are complete, a confirmed booking is typically held within 24 hours. Freight quotations move with the market, so a rate quoted last week is information, not a price; we re-quote at booking time.

The documents travel with the machine

Whatever the method, a fixed set of documents accompanies the cargo:

  • The commercial invoice, describing the unit exactly as it is described on the bill of lading
  • The packing list, especially when the machine ships dismantled with loose parts
  • The bill of lading, issued after loading, and the clearing agent's key document
  • The certificate of origin and any conformity documents your import regime requires

A mismatch between the invoice description and the bill of lading is one of the most common causes of clearance delays, and entirely avoidable. We send scanned copies of the full set as soon as documents are issued, so your clearing agent can start before the originals arrive.

Before the unit reaches the port: the buyer's checklist

Shipping runs smoothly when the buyer's side is prepared a week early, not a week late. Check the import rules that apply to used units in your country, including any age limits, before you choose a unit. Confirm that your discharge port can receive the machine and that an inland permit exists if the unit must move on the road after discharge.

A machine that ships well is a machine that was prepared a week before the vessel, not a week after it.

If you are weighing shipping methods for a specific unit, send us the machine details and your discharge port and we will lay out the options as they actually apply — our current stock is updated as units arrive, and past loading jobs are documented in our case records. For a shipping plan, contact us with the machine specification and destination.